Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Projects - Amerion Telecommunications Skip to content

Handling Telecommunications Contracting Projects Efficiently

Angelina Forest Products

Angelina Forest Products

This project involved the complete design, installation, and turnover of a physical business, mill-wide fiber network. The solution contained over 9,000 feet of 48 strand Singlemode fiber optic cable, over 9,000 feet of 12 strand singlemode cable, over 720 fiber terminations, 130 Cat6 Cables, and 13 IDF buildouts across the plant.

Microstar Logistics Plant in Eagle Pass, TX

Microstar Logistics Plant in Eagle Pass, TX

The deployment of approximately 120 Cat6 Enhanced UTP
Horizontal Cable Links and about 4,000 foot of singlemode, armored, 6 and 12 strand optical fiber backbone cable.

CHI St. Luke's Clinic Cabling Projects

The deployment of more than 300 Cat6 Data Cable Links at various clinics. Solutions are complete with the necessary pathway support, patch panels, firestop systems, faceplates, and jack modules.

Lufkin ISD DOI/DEC Renovation

The deployment of (214) Cat6 Cables in a full Structured Cabling System, complete with MDF buildout and structured pathway provision.

Scroll To Top